Sebring Airport Multimodal Logistics Center Drainage Improvements

Drainage

Project Overview

Location: Sebring, Florida

Client: Sebring Airport Authority

Completion Date: October 2024

QE completed the installation of 3,250 LF of 18”- 54” ADS drainage piping and associated drainage structures within the aircraft movement area of the Sebring Airport. There were several taxiway crossings that required extensive coordination with the airport and air traffic control. QE also had to keep the drainage system functional during construction as the upstream neighbor was the Sebring International Raceway. We had to setup a network of bypass pumps because plugging the lines like usual would have flooded the. Quality Enterprises completed the ahead of schedule by exactly 30 days.

See More Projects

Sewer & Water

City of Melbourne: Pineda Causeway Water Tranmission Main Project

The project consisted of the installation of over 40,000 linear feet of water transmission main…

Roadways

City of Venice Downtown Corridor Improvements

Overview This project involved extensive improvements to three of the major roadways within Venice, FL’s…

Infrastructure

Design-Build of Pump Station Emergency Power Resiliency

This project included the installation of fourteen (14) automatic emergency backup power systems (generators or…

Stay in touch with QE! Follow @qualityenterprisesusa