Sebring Airport Multimodal Logistics Center Drainage Improvements

Project Overview
Location: Sebring, Florida
Client: Sebring Airport Authority
Completion Date: October 2024
QE completed the installation of 3,250 LF of 18”- 54” ADS drainage piping and associated drainage structures within the aircraft movement area of the Sebring Airport. There were several taxiway crossings that required extensive coordination with the airport and air traffic control. QE also had to keep the drainage system functional during construction as the upstream neighbor was the Sebring International Raceway. We had to setup a network of bypass pumps because plugging the lines like usual would have flooded the. Quality Enterprises completed the ahead of schedule by exactly 30 days.
Photo Gallery


See More Projects
City of Melbourne: Pineda Causeway Water Tranmission Main Project
The project consisted of the installation of over 40,000 linear feet of water transmission main…
City of Venice Downtown Corridor Improvements
Overview This project involved extensive improvements to three of the major roadways within Venice, FL’s…
Design-Build of Pump Station Emergency Power Resiliency
This project included the installation of fourteen (14) automatic emergency backup power systems (generators or…